PureTek Group successfully completed a comprehensive theater upgrade at JFK High School in Paterson, NJ. The project addressed safety concerns by repairing and replacing the existing rigging system, installing flame-resistant drapery. Upgrades included a new dimming infrastructure, LED stage lighting fixtures, improved house lighting, emergency backup, and RGBW LED downlights. With programming, training, and maintenance services, PureTek Group transformed the theater into a safer, functional, and visually captivating space, enhancing the performing arts experience for students and the community.

LOCATION
Paterson, NJ

DATE
Winter ’23

CATEGORY
Stage

PARTNERS
Northeast Stage

 

Project Photos

Project Solutions

Challenges

1) The existing rigging system contained several code violations and safety concerns which had been exacerbated by continual ware and tear.  

2) Previous house lighting provided insufficient and uneven illumination, and thereby dramatically reduced opportunities for auditorium usage.

3) Old theatrical lighting system relied on outdated technology that limited student performance quality and rental opportunities

 

The Solution:

PureTek Group completed a comprehensive theater upgrade at JFK High School in Paterson, NJ, improving safety, functionality, and aesthetics. The project involved repairing and replacing non-code compliant stage rigging, as well as installing flame-resistant theater drapery and curtains. A new theatrical stage dimming infrastructure system was furnished, featuring intuitive controls, a professional lighting console, and enhanced power distribution and networking capabilities. The upgrade also included new LED stage lighting fixtures for a uniform stage wash and compliance with production standards. Additionally, house lighting and backstage work lighting were installed, with a 90-minute emergency backup system for automatic restoration during power failures. RGBW LED recessed downlights were added for dynamic event lighting.  PureTek Group handled programming, commissioning, training, and maintenance for the entire system. 
The theater upgrade by PureTek Group at JFK High School has transformed the space into a safer, more efficient, and visually captivating venue, enhancing the performing arts experience for students and the community.

Tech Spotlight