Barone Engineering Joins BRRHS Theater Upgrade Project

Barone Engineering Joins BRRHS Theater Upgrade Project

Barone Engineering Joins BRRHS Theater Upgrade Project   As of Monday August 7, we have entered into a formal agreement with Barone Engineering Associates for their review and PE stamp on our submittal drawings. As everyone is aware the electrical permit has been...
Bridgewater-Raritan HS Site Visit Report: 7/6/2023  

Bridgewater-Raritan HS Site Visit Report: 7/6/2023  

Bridgewater-Raritan HS Site Visit Report: 7/6/2023 Visit Date: July 6, 2023 Members On-Site Include: Laura Bassett – Supervisor of Performing Arts @ Bridgewater-Raritan Regional School District Brian Smith – Assistant Principle @ Bridgewater-Raritan High...
BRRSD HS Theater Upgrade Overview

BRRSD HS Theater Upgrade Overview

Project Overview: Bridgewater-Raritan High School Theater Upgrade Theater Infrastructure and Controls New Theatrical Stage Dimming Infrastructure System at the Bridgewater-Raritan Regional High School Theater scope consists of the following dimming controls and...